Bestmanga

Identifiez-vous avec le pseudo d'administration pour configurer et personaliser votre forum.

Vous n'êtes pas identifié.

#1 19-05-2018 08:22:14

misshuana
Floodeur
Date d'inscription: 23-07-2016
Messages: 914

voted for Trump Air Jordans 6 Retro Gatorade

Liverpool's Emre Can (R) vies with Bayern Munich's Franck Ribery during a semifinal match of Audi Cup 2017 between Liverpool F.C. from England and Bayern Munich from Germany nike air presto uomo scontate , in Munich, Germany nike presto uomo scontate , on Aug. 1, 2017. Liverpool won 3-0. (XinhuaPhilippe Ruiz)






Military parade held to mark PLA 90th birthday (Part I)


SWAT team members take part in drill


Acrobatic show staged in China's Xinjiang


Martial arts competition held in China's Henan


Int'l Army Games 2017 held in NW China


Triplet giant pandas celebrate 3rd birthday in S China's Guangzhou


Annual maximum peak of Hukou Waterfall seen due to heavy rainfall


Blossoming lotus flowers in China's Anhui



RIO DE JANEIRO nike air presto essential scontate , July 26 (Xinhua) -- The Brazilian football confederation (CBF) has scrapped plans to stage October's World Cup qualifier between Brazil and Chile at the Maracana stadium, extending the national team's exile from its spiritual home.


The October 10 clash - Brazil's final 2018 World Cup qualifier - will instead be played at Palmeiras' Allianz Park in Sao Paulo nike presto viola scontate , the CBF said on Wednesday.


The decision means Brazil will complete its 18-game qualifying schedule without playing a match at the Maracana.


The stadium has been used sparingly in the past year amid a row over unpaid bills between Rio's debt-saddled state government - which owns the venue - and operator Maracana SA, whose largest stakeholder nike presto verdi scontate , Odebrecht, is embroiled in a sprawling corruption scandal.


Brazil lead the South American zone World Cup qualifying standings and have already secured a berth in the showpiece tournament in Russia next year.






WASHINGTON nike presto rosse scontate , July 13 (Xinhua) -- The International Monetary Fund (IMF) said Monday that Greece missed a new repayment worth of about 456 million euros to it by the day after the country failed to make a 1.5 billion-euro repayment due on June 30.


"The SDR 360 million principal repayment (about 456 million euros) due by Greece to the IMF was not received," said Gerry Rice nike presto rosa scontate , director of Communications at the IMF in a statement.


On June 30, Greece failed to make 1.5 billion euros of repayment to the Washington-based global lender. To date nike presto nere scontate , Greece's arrears to the IMF total about 2 billion euros.


Rice said that the IMF executive board will discuss Greece's request for an extension of the repayment due on June 30 in the coming weeks.


After marathon tough negotiations, the leaders of euro zone countries reached a bailout agreement for Greece to avoid bankruptcy nike presto grigie scontate , provided the Greek government implements harsh austerity measures.





TOKYO, March 11 (Xinhua) -- While Japan marks the sixth anniversary on Saturday of the 2011 earthquake and tsunami and the subsequent Fukushima nuclear disaster, how the aftermath has been dealt with has drawn much attention and concern from all over the world.


Tokyo Electric Power Company Holdings Inc. (TEPCO), operator of the crippled Fukushima Daiichi nuclear plant, has said it plans to decommission the reactors in about four decades.


However, the difficult tasks such as processing contaminated water, cooling the reactors and removing nuclear fuel and debris, continue to pose serious challenges to the power company as well as the government.


DECOMMISSIONING HIGHLY PROBLEMATIC


The massive earthquake and the ensuing tsunami on March 11, 2011 severely damaged three reactors at Daiichi facility in Fukushima, which suffered core meltdowns after their key cooling systems were knocked out and backup power supplies rendered useless.


TEPCO has, since the disaster, successfully decommissioned the No. 5 and 6 reactors at the plant, and more than 1,500 fuel rods in the No. 4 reactor have been taken out and safely stored.


But removing the melted nuclear fuel rods from the No.1-3 reactors poses the biggest challenge yet to the decommission work, according to experts, and TEPCO, apparently, has not come up with a viable solution yet.


Naohiro Masuda, head of the decommissioning unit of TEPCO, told Xinhua recently that TEPCO will come up with a plan after discussing with the government this summer, but how the plan will proceed is not yet clear.


One of the difficulties lies in the extremely high radiation levels inside the reactors, and the fact that the actual condition of the melted fuel inside the reactors remains unknown.


The operator of the crippled power plant said last month that levels of radiation as high as 650 sieverts per hour were detected inside the No. 2 reactor, much higher than an earlier reading of 73 sieverts per hour in 2012. The amount of radiation is enough to kill a person, even after being exposed for just a brief period of time.


Even robots sent to gather information in the damaged reactor suffered malfunctions and failures, possibly due to extremely high levels of radiation.


The power company said on Thursday that it will attempt to examine the inside of the No. 1 reactor of the Fukushima Daiichi nuclear plant next Tuesday using another remote-controlled robot, following a failure last month to robotically look into the No. 2 reactor.


There have also been concerns that the melted nuclear fuel residue is eroding through the concrete bottom of the safety shell of the reactors, having already penetrated the reactor pressure vessel.


Masuda denied such a possibility, however, saying that "although we don't have direct confirmation about the concrete bottom of the safety shell, based on other information, we think the residue has not eroded through the bottom."


"The bottom might have been eroded by fifty or sixty centimeters, but it is as thick as two or three meters, so there is no need to worry," he added.


CONTAMINATION IN PACIFIC UNKNOWN


To keep the No.1 to 3 reactors cooled, TEPCO has to inject a large amount of. Soccer Jerseys Cheap   NBA Jerseys China   NHL Jerseys Cheap   Jerseys Cheap   Jerseys Wholesale   New NHL Jerseys Cheap   Nike NFL Jerseys Cheap   Throwback NCAA Jerseys Cheap   NBA Basketball Jerseys Cheap   Authentic Soccer Jerseys Cheap

Hors ligne

 

Pied de page des forums

Créez Votre Propre Forum
Insérer vos Graphiques
Dictionnaires de Traduction
Hébergé par ForumCrea.com